Creating and maintaining master production schedules
Introduction
You can enter production planning or forecast by items in the
Master Production Schedule (MPS) at
Manufacturing ➔ Planning ➔ Master Production Schedule. After
defining the search criteria, click Start to open the
Master Production Schedule
screen.
The objective
of the Master Production Schedule (MPS) is to plan and control materials
and capacity of resources to meet production demands. The MPS defines the number
of end items that need to be produced within a certain period based on a
forecast. The MPS is also used to calculate expected material requirements to
meet the production schedule.
After the date range of the MPS has expired, it is advisable to
compare the production planning and production order history. This enables you
to check whether the expectations have actually been realized. Planners can use
this as a tool to plan for production requirements for a new
period.
Fields
You
can filter the MPS for items that you want to plan or forecast for. To filter,
you can define one or more of the search criteria. The items that match the search
criteria you have entered are then displayed.
Warehouse
By
default, this cannot be modified as it is the predefined criteria from Manufacturing ➔ Planning ➔ Master Production
Schedule. The MPS you create will be the MPS for
all items in this warehouse. Items can be used and/or stored in different
warehouses. This also means that the demand for different items can vary per
warehouse.
Date
By
default, this cannot be modified as it is the predefined criteria from Manufacturing ➔ Planning ➔ Master Production
Schedule. The MPS you create
will be the MPS for all items valid within this date range.
Budget
scenario
By
default, this cannot be modified as it is the predefined criteria from Manufacturing ➔ Planning ➔ Master Production
Schedule. The MPS is then created according to this budget scenario. This
enables you to simulate, in several ways, when a certain amount of items will be
required (What-if analysis).
Cost center
Type or select a cost center to create a production plan for this cost center. This
is mandatory.
Debtor
Type or select a debtor to create a production plan for this debtor.
Cost
unit
Type
or select a cost unit to create a production plan for this cost
unit.
Creditor
Type
or select a creditor to create a production plan for this creditor.
Person
Type
or select a person ID to create a production plan for the person.
For
each required finished goods or subassembly item, an estimate can be made of the
quantity that must be produced and for which period it must be produced. This
information is saved when you click Close.
Buttons
Close
Click this to save and exit.
Related documents
Main Category: |
Attachments & notes |
Document Type: |
Support - On-line help |
Category: |
|
Security level: |
All - 0 |
Sub category: |
|
Document ID: |
30.048.859 |
Assortment: |
Exact Globe
|
Date: |
01-04-2021 |
Release: |
|
Attachment: |
|
Disclaimer |